gp4

时间:2024-04-06 00:00:09编辑:coo君

质量管理里的GP10、GP11、GP12分别指什么?

GP10、GP11、GP12这三个都是通用汽车(GM)的程序文件代码。GP10:供应商检测设备的评价和鉴定(GM1796)。GP11:关于前期样件及样件材料供应商程序。GP12:早期生产遏制(GM1920)。通用汽车(GM)的GP4、GP5、GP6、GP7、GP8、GP9、GP10、GP11、GP12的区别及解释GP是与通用公司配套的汽车件生产厂商出厂前的最后一道检验程序,目的是供方站在顾客的角度对产品入库前进行最后一道工序的检查。GMNA GP 4 Pre-Production/Pilot Material Shipping Procedure-See Document GM 1407; Refer to GMNAGP4 GMGP4 GM4GMNA GP 5 Supplier Quality Processes and Measurements Procedure-See Document GM 1746; Refer to GMNAGP5 GMGP5 GM5GMNA GP 6 Supplier Submission of Match Check Material-See Document GM 1689; Refer to GMNAGP6 GMGP6 GM6GMNA GP 7 Component Verification and Tracebility Procedure-See Document GM 1730; Refer to GMNAGP7 GMGP7 GM7GMNA GP 8 Continuous Improvement Procedure-See Document GM 1747; Refer to GMNAGP8 GMGP8 GM8GMNA GP 9 Run @ Rate-See Document GM 1960; Refer to GMNAGP9 GMGP9 GM9GMNA GP 10 Evaluation and Accreditation of Supplier Test Facilities-See Document GM 1796; Refer to GMNAGP10 GMGP10 GM10GMNA GP 11 General Procedure for Pre-Prototype and Prototype Material-See Document GM 1820; Refer to GMNAGP11 GMGP11 GM11GMNA GP 12 Early Production Containment Procedure-See Document GM 1920; Refer to GMNAGP12 GMGP12 GM12GP4:生产件批准状况通知(GM1407)GP5:供应商质量监控流程(GM1746) GP6:供应商对匹配检查材料的呈报(GM1689)GP7: 可追溯性(GM1730)GP8:持续改进程序(GM1747) GP9:按节拍生产品(GM1960) GP10:供应商检测设备的评价和鉴定(GM1796)GP11:关于前期样件及样件材料供应商程序(GM1820)GP12:早期生产遏制(GM1920)GP10、GP11、GP12并非是质量管理方法,而是通用汽车(GM)针对内部及供应商培训的一些质量管理流程的缩写。

请问通用汽车(GM)的 GP4到GP12各指什么?

GP4:生产件批准状况通知(GM1407)GP5:供应商质量监控流程(GM1746) GP6:供应商对匹配检查材料的呈报(GM1689)GP7: 可追溯性(GM1730)GP8:持续改进程序(GM1747) GP9:按节拍生产品(GM1960) GP10:供应商检测设备的评价和鉴定(GM1796)GP11:关于前期样件及样件材料供应商程序(GM1820)GP12:早期生产遏制(GM1920)GP10、GP11、GP12并非是质量管理方法,而是通用汽车(GM)针对内部及供应商培训的一些质量管理流程的缩写。

上一篇:高新审计

下一篇:奥古斯都凯撒